The Contracting
Dictionary
CONTRACTOR -- A gambler who never gets to shuffle, cut or deal.
BID OPENING -- A poker game
in which the losing hand wins.
BID -- A wild guess carried
out to two decimal places.
LOW BIDDER -- A contractor
who is wondering what he left out of his bid.
ENGINEER'S ESTIMATE -- The
cost of construction in heaven.
PROJECT MANAGER -- The
conductor of an orchestra in which every musician is in a different union.
CRITICAL PATH METHOD - A
management technique for losing your shirt under perfect control.
OSHA -- A protective coating
made by half-baking a mixture of fine print, red tape, split hairs and baloney
usually applied at random with a shotgun.
STRIKE -- An effort to
increase egg production by strangling the chicken.
DELAYED PAYMENT -- A
tourniquet applied at the pockets.
COMPLETION DATE -- The point
at which liquidated damages begin.
LIQUIDATED DAMAGES -- A
penalty for failing to achieve the impossible.
AUDITOR -- People who go in
after the war is lost and bayonet the wounded.
LAWYER -- People who go in
after the auditors and strip the bodies.